Location Gelsenkirchen, Germany
Project Framework grid of steel pipes (4.000 tons); Sliding roofs above the infield; Glass-PTFE Membrane, double-layer (40,000 m²)
Scope F. Weller Supervision Roof
Duration 1999 - 2001
Client HBM Bau GmbH, Essen