Location
Berlin, Germany
Project
Two buildings as composite steel/concrete with steel framework outside above the roof of the station, Glass roof between the buildings on a curved net shell
Scope F. Weller
Supervision of steel and glass for Archbuildings and N/S-Roof
Duration
2003 - 2006
Client
Engineering Company Vössing, Berlin for Deutsche Bahn Projektbau (German Rail)